Industry · Built around how you buy
Construction
Built around the way GCs and superintendents actually order freight.
Steel by the bundle. Pre-cast on a Tuesday. A generator that has to be on-site before the inspection at 7 a.m. Construction freight breaks every assumption commodity LTL carriers make — so we built our flatbed and jobsite service around the way the schedule actually moves.
For: General contractors · superintendents · jobsite logistics managers
What you call us for
The construction freight problems that don't fit a portal.
Every job has a calendar — inspections, pours, deliveries that have to land between the framing and the drywall. Here are the freight problems that get our phone ringing, and what we do about each.
- Jobsite access is tight Flatbed with hand-unload, hotshot for back-lot drops, pup-trailer splits where a 53′ won't fit.
- Inspection or pour deadlines Hotshot dispatch within 2 hours · direct origin-to-destination · no consolidation stops.
- Material delivered too early Lilburn warehouse staging · release to site on your draw schedule.
- Oversize or over-height load Step-deck, double-drop, RGN · permits and pilot routes handled in-house.
- Partial flatbed cost trap Flatbed LTL billed by linear feet · no phantom density or accessorial surprises.
- POD friction with the office Same-day digital POD · driver phone shared on every dispatch.
What we move
From rebar bundles to roof-top HVAC.
The freight construction crews actually order — long, heavy, awkward, jobsite-bound. We've moved it for builders across the southeast for five decades.
- ·Structural steel
- ·Rebar bundles
- ·Pre-cast concrete
- ·Pipe & conduit
- ·Generators
- ·HVAC rooftop units
- ·Scaffolding
- ·Lumber & treated wood
- ·Roofing materials
- ·Site trailers
- ·Heavy tools
- ·Materials for inspection windows
Why Comet for construction
A carrier that reads the schedule, not just the BOL.
Construction logistics is a sequencing problem dressed up as a shipping problem. We've been the carrier behind the schedules of GCs across the southeast since 1970 — we know the difference between a permit you can route around and one you can't, between a foreman who'll hand-unload and one who won't.
Services we recombine for construction
The modes this industry actually buys.
- Flatbed LTL Partial flatbed for pumps, big iron, generators, transformers, tanks, and raw materials. Explore service
- Flatbed / Open Deck Full flatbed, step-deck, double-drop, RGN — oversized and specialty. Explore service
- Hotshot Expedited urgent freight when a load can't wait. Explore service
- Warehousing & Fulfillment Short and long-term storage with optional pick-and-pack. Explore service
How it works
Quote. Schedule. Rest easy.
- 01
Get a quote
One call, every mode. We match the right trailer to your load.
- 02
Schedule the shipment
Pickup, transload, paperwork, delivery — handled.
- 03
Rest easy
Real updates, real people. We solve the whole problem.
Tell us about the freight.
The quote form takes a minute. The right answer often takes less.
Get a Quote