Service · By trailer

Flatbed LTL

You only pay for the space you use.

Partial flatbed for pumps, big iron, generators, transformers, tanks, and raw materials.

What we haul

Anything heavy, anything awkward.

The freight that doesn't fit a standard pallet, doesn't ride well in a van, and doesn't deserve a full trailer minimum.

  • ·Industrial pumps
  • ·Construction equipment
  • ·Big iron & castings
  • ·Generators
  • ·Transformers
  • ·Tanks & vessels
  • ·Steel & raw materials
  • ·Pre-cast concrete
  • ·Scaffolding
  • ·HVAC units
  • ·Reinforced rebar
  • ·Lumber & treated wood

Why Flatbed LTL — cost trap explainer

A $500 freight bill becomes $3,500. Here's how.

Standard LTL carriers price by density and minimum class. The moment your freight breaks 12 linear feet or hits "exceeds 750 cubic feet," accessorials kick in: Density Minimum Charge, Linear Foot Charge, Over-Dimensional Surcharge. Stack them up and the quote you got isn't the bill you pay.

Standard LTL — the trap

Base rate$500
Density Minimum Charge+ $1,400
Linear Foot Charge (16′)+ $1,200
Over-dimensional surcharge+ $400
What you actually pay$3,500

Comet Flatbed LTL — pay the space

Linear feet quoted16 ft
Per-foot rateflat
Accessorialsnone for size
What you actually paythe quote

No phantom density. No surprise linear-foot lookup. The number you get is the number you pay.

How it works

Quote. Schedule. Rest easy.

  1. 01

    Get a quote

    One call, every mode. We match the right trailer to your load.

  2. 02

    Schedule the shipment

    Pickup, transload, paperwork, delivery — handled.

  3. 03

    Rest easy

    Real updates, real people. We solve the whole problem.

Tell us about the load.

The quote form takes a minute. The right answer often takes less.

Get a Quote
Call us Get a Quote